Take a brief tour of the almost completed upstairs of the newly construction Children’s Home:

 

 

Check out the progression of the construction:

boys in the house

The boys in front of the inside walls on the second level

 

building progress1

Completed wall with framed in window on the second level 

building progress2

Top view of second level rooms 

firmin home roof

Preparing the roof for the cement 

Firmin home plasture

Plastering the walls on the second level 

building progress4

Plumbing installed in a bathroom on the second level 

Firmin home plasture2

Plastered walls in the hallway of the second level 

Firmin home peak

Front view of the home